History

A strong foundation

ECPC has built a legacy of excellence since 1978 as Egypt’s leading manufacturer of precast concrete solutions for infrastructure across the Middle East. Our journey began with a commitment to quality and innovation, establishing a state-of-the-art factory in 10th of Ramadan City spanning 13 hectares for producing Prestressed Concrete Cylinder Pipes (PCCP) to international standards.

Growth in PCCP Production

Over decades, we expanded capacity to deliver PCCP for critical infrastructure projects throughout Egypt and beyond, strengthening regional water, tunneling, and metro systems with reliable, high-performance solutions.

Expanded Precast Portfolio

Today, ECPC provides a comprehensive range of precast concrete products—from reinforced pipes and tunnel segments to bridge girders and slabs—serving as a one-stop partner for diverse construction needs.

ECPC Steel cylinder production for PCCP in precast concrete infrastructure history.
ECPC official logo – precast concrete infrastructure history and leadership in Egypt.
Early production facilities in the precast concrete infrastructure history of ECPC.
1978

ECPC is founded in 10th of Ramadan City on a land of 13 Hectare  (130 000 m2)

ECPC corporate office during the early years of our precast concrete infrastructure history.
1979

Cairo headquarters

Early industrial machinery used in the precast concrete infrastructure history of ECPC.
1979

Production started and has reached a capacity of (180Km-200Km) per year.

Historical metro project site from the precast concrete infrastructure history of Cairo.
1982

Award of Utility transfers Project for Cairo Metro Project.

Engineering milestones in the precast concrete infrastructure history of Egypt.
1984

ECPC started the tunnels precast concrete segments in Egypt, for Greater Cairo Sewage bolted segment rings. 

Building the city's landmarks within our precast concrete infrastructure history.
1987

The start of the precast concrete panels production to fulfill 16,000 panels for New Kasr Al Aini Hospital.

Reinforced Concrete Pipes (RCP) in Egyptian precast concrete infrastructure history.
1989

Reinforced Concrete Pipes line certified and started supplying 2,000 m of RCPJ for 6th of  October sewage line project

Cairo Metro Line 2 tunnel rings in precast concrete infrastructure history.
1993

ECPC awarded to be the supplier of segments for Cairo Metro – line 2

Large diameter PCCP installation from ECPC precast concrete infrastructure history.
2009

The successful manufacturing of the biggest PCCP diameter in Egypt 2500mm and supplying 30,000 m for 10th of Ramadan Water

Prestressed beams highlighting our recent precast concrete infrastructure history.
2017

ECPC leading the manufacturing of prestressed pretention beams with an average span of 30 m & 40 m for the first time in Egypt for the elevated viaduct section of Cairo Metro Line 3)

The modern headquarters representing the growth and precast concrete infrastructure history of ECPC.
2025

47+ years of redefining what’s possible